HOUSING CONTRACTS

Ian Williams Carpentry has, over many years, built up an enviable reputation of providing a quality dedicated service and workmanship of the highest standards for numerous national house builders.

 

Whether it be a standard housing development of house fittings and finishes or a luxury bayside high rise apartment block, the same quality and commitment to detail is guaranteed. This is reflected in the numerous NHBC quality merit awards achieved on completed projects. These awards are recognised by homebuyers who are looking to purchase a quality product.

 

In Wales and the South West, the Company is one of the largest and well respected carpentry contractors in the industry, renowned for its experienced workforce who can successfully undertake even the largest of developments.

The Mill

Project: The Mill
Project Value: £551,000
Client: Lovell
Requirements: General Joinery, Doorsets & Ironmongery, All Aspects of Housing
Location: Cardiff
Sector: Residential

IWC started this project in June 2017.  Work involves the supply and installation of doorsets and skirting.

 

The Mill is a brand new sustainable community featuring 800 high quality houses and apartments on the former Paper Mill site in Canton, Cardiff.

 

The project consists of 1 and 2 bedroom apartments and 2, 3 and 4 bedroom homes.

St Ederyns

Project: St Ederyns
Project Value: £603,000
Client: Bellway
Requirements: All Aspects of Housing
Location: Pontprennau, Cardiff
Sector: Residential

IWC are currently working on this new project.  Work  involves the supply and install of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.  IWC will also supply CLS for studwork and plasterboard for top tack.  All work will be managed by a team of IWC operatives.

 

St Ederyns is a collection of 150 3, 4 and 5 bedroom houses.

Lawrence Green

Project: Lawrence Green
Project Value: £230,000
Client: Redrow
Requirements: General Joinery, Doorsets & Ironmongery, All Aspects of Housing
Location: Bristol
Sector: Residential

IWC completed this project in 2017.  IWC installed trusses and joists and completed 1st and 2nd fixes together with finals and cladding to all houses at the above project.  IWC also supplied all ironmongery.  All works were carried out by a team of IWC operatives.

 

Lawrence Green offers something for everyone with 2, 3 and 4 bedroom homes plus stylish apartments.  

Edlogan Wharf

Project: Edlogan Wharf
Project Value: £293,000
Client: Taylor Wimpey
Requirements: General Joinery, All Aspects of Housing
Location: Cwmbran
Sector: Residential

IWC are currently working on this new project.  IWC install trusses and joists and complete 1st, 2nd and final fixes to all houses at the above project.

 

A selection of 2,3 and 4 bedroom homes in this first phase comprising of 210 homes.

 

The full mixed use development will comprise of 1200 new homes.

South Sebastopol

Project: South Sebastopol
Project Value: £707,000
Client: BDW Homes
Requirements: All Aspects of Housing
Location: Cwmbran
Sector: Residential

IWC are currently working on this project.  IWC provide and install trusses and joists and complete 1st, 2nd fix, finals and cladding to all houses at the above project.  IWC also supply all doorsets, CLS for studwork, plasterboard for top tack, skirting, architrave, flooring, ironmongery and cladding.  All works are monitored by IWC operatives.

 

At Hanbury Village, you will find a superb collection of 2, 3, 4 and 5 bedroom homes.

Westgate House

Project: Westgate House
Project Value: £350,000
Client: Crest Nicholson
Requirements: General Joinery, Doorsets & Ironmongery, Specialist Carpentry, All Aspects of Housing
Location: Bristol
Sector: Residential

IWC completed this project in 2016.  Work involved the installation of timber doorsets, ironmongery, miscellaneous joinery, skirting and window boards.

 

The scheme involved the redevelopment of Electricity House which was a former retail and office space building into an opulent mix of  85 luxurious 1 and 2 bed plus duplex 3 bed apartments.

 

 

 

 

 

Penarth Heights

Project: Penarth Heights
Project Value: £1,000,000
Client: Crest Nicholson
Requirements: General Joinery, Doorsets & Ironmongery, Timber Cladding, All Aspects of Housing
Location: Penarth
Sector: Residential

IWC completed Phase 1 of this project in 2016 and are currently working on Phase 2.  Works involved the installation of trusses, joists, 1st fix, 2nd fix, finals and cladding to all houses at the above project.

 

Penarth Heights is a mix of 286 1 and 2 bedroom apartments and 3 and 4 bedroom houses.

The Grange, Wenvoe

Project: The Grange, Wenvoe
Project Value: £250,000
Client: Redrow
Requirements: General Joinery, Doorsets & Ironmongery, Timber Cladding, All Aspects of Housing
Location: Wenvoe
Sector: Residential

IWC are currenty working on Phase 2 of the above site  which consists of 132,  3 & 4 bedroom houses.  IWC are installing trusses, joists, providing 1st fix, 2nd fix, finals and cladding to all houses at this project.

Manor Park, Sully Road

Project: Manor Park, Sully Road
Project Value: £450,000
Client: David Wilson
Requirements: All Aspects of Housing
Location: Penarth
Sector: Residential

IWC are currently working on this housing project which comprises of 74 Traditional styled 3, 4 and 5 bedroom homes.

 

Work involves the installation of trusses, joists, providing 1st fix, 2nd fix and finals  to all houses at the above project.  IWC are also supplying all doorsets, CLS for studwork, plasterboard for top tack, skirting, architrave, flooring and ironmongery.  All work is managed by IWC operatives.

Cardiff Pointe

Project: Cardiff Pointe
Project Value: £1,000,000
Client: Kier
Requirements: General Joinery, Doorsets & Ironmongery, Decking, All Aspects of Housing
Location: Cardiff
Sector: Residential

IWC completed this project in April 2016.    Cardiff Pointe  -  a prestigious water front development at Cardiff Bay consists of a mix of 55 high end apartments and separate dwellings in the form of 1,2 and 3 bedroom apartments and 4 & 5 bedroom houses.

 

Works included doors, ironmongery, window boards and skirting, balustrading, balconies, joist work and decking and duradeck to public walkways.

 

 

St James Gardens

Project: St James Gardens
Project Value: £750,000
Client: David Wilson Homes
Requirements: All Aspects of Housing
Location: Vale Of Glamorgan
Sector: Residential

IWC are currently working on this project.  St James Gardens is an exclusive development of a premium range of 2, 3, 4 and 5 bedroom homes with impressive views.

 

Work involves the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.  We supply all doorsets, CLS for studwork, plasterboard for top tack, skirting, architrave, flooring and ironmongery.  All of our work is carried out by IWC operatives.

Lanelay Hall

Project: Lanelay Hall
Project Value: £550,000
Client: Barratt Homes
Requirements: All Aspects of Housing
Location: Talbot Green
Sector: Residential

IWC are currently working on this project.  Lanelay Hall is a new housing development consisting of 87 new 3, 4 and 5 bedroom homes.

 

Work involves the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.  We supply all doorsets, CLS for studwork, plasterboard for top tack, skirting, architrave, flooring and ironmongery which is managed by IWC operatives.

Awel Y Garth

Project: Awel Y Garth
Project Value: £220,000
Client: Redrow Homes
Requirements: All Aspects of Housing
Location: Pentyrch
Sector: Residential

IWC are currently working on this development of 51 units comprising of 3, 4 and 5 bedroom detached and semi-detached homes. 

 

Work includes the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.  IWC also supply all ironmongery and the work is managed by IWC operatives.

Monks Meadow

Project: Monks Meadow
Project Value: £650,000
Client: Bellway
Requirements: All Aspects of Housing
Location: Newport
Sector: Residential

IWC are currently working on the above project.  Monks Meadow is a development of 182 new homes in a range of 2, 3 and 4 bedrooms. 

 

Work currently being undertaken is the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.  IWC supply all CLS for studwork and plasterboard for top tack - all of which is managed by IWC operatives.

Green Park

Project: Green Park
Project Value: £130,000
Client: Wates
Requirements: All Aspects of Housing
Location: Port Talbot
Sector: Residential

IWC completed this project in 2016.   Green Park is a £4.5 million social housing scheme in Port Talbot. It is the first of a number of housing led regeneration projects in the town. The multi-million pound investment at Green Park marked the start of a £25 million three-year housing led regeneration programme in Port Talbot, which will see a transformed town centre with 140 new affordable homes.

Sutton Chase

Project: Sutton Chase
Project Value: £700,000
Client: David Wilson Homes
Requirements: All Aspects of Housing
Location: Ogmore By Sea
Sector: Residential

IWC completed this project during 2017.  Sutton Chase is an exciting new development in the picturesque coastal village of Ogmore-by-Sea, offering a selection of 3 and 4 bedroom homes.

 

Work involved the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.  IWC supplied all doorsets, CLS for studwork, plasterboard for top tack, skirting, architrave, flooring and ironmongery.  All of our work was carried out by IWC operatives.

 

 

Parc Celyn

Project: Parc Celyn
Project Value: £520,000
Client: Taylor Wimpey
Requirements: All Aspects of Housing
Location: Cwmbran
Sector: Residential

IWC are currently working on this project.  Parc Celyn is a development of 2, 3 and 4 bedroom houses and 1 bedroom apartments.

 

Work involves the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.

Stanley Park

Project: Stanley Park
Project Value: £500,000
Client: Redrow Homes
Requirements: General Joinery, All Aspects of Housing
Location: Bristol
Sector: Residential

IWC are currently working on this development which comprises of 4 and 5 bedroom homes with Redrow's innovative Cheswick Urban Village.

 

Work includes the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.  IWC also supply all ironmongery and the work is managed by IWC operatives.

St Lythans Park

Project: St Lythans Park
Project Value: £750,000
Client: Bellway Homes
Requirements: All Aspects of Housing
Location: Wenvoe
Sector: Residential

IWC are currently working on the above project.  St Lythans Park is a development consisting of 2, 3, 4 and 5 bedroom homes.

 

Work currently being undertaken is the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.  IWC supply all CLS for studwork and plasterboard for top tack - all of which is managed by IWC operatives.

City Vizion

Project: City Vizion
Project Value: £300,000
Client: Taylor Wimpey
Requirements: All Aspects of Housing
Location: Newport
Sector: Residential

IWC completed this project in 2016.  Works on this eclectic collection of townhouses, two storey terraced homes, a coach house and stylish apartments involved the installation of trusses, joists, 1st fix, 2nd fix and finals.

Dyffryn Glas

Project: Dyffryn Glas
Project Value: £250,000
Client: Persimmon Homes
Requirements: All Aspects of Housing
Location: Pontypridd
Sector: Residential

IWC completed this project in 2016.  Works involved the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.

 

Dyffryn Glas is a mix of two, three and four bedroom homes in Hawthorn, on the outskirts of the historic town of Pontypridd.

The Grange

Project: The Grange
Project Value: £220,000
Client: Charles Church
Requirements: All Aspects of Housing
Location: Chepstow
Sector: Residential

IWC completed this project in 2016.  Works involved the installation of trusses, joists, 1st fix, 2nd fix, finals and cladding to all houses at the above project.  

 

IWC also supplied all doorsets, CLS for studwork, plasterboard for top tack, skirting, architrave, flooring, ironmongery and cladding which was managed onsite by an IWC operative.

 

 

Channel Heights

Project: Channel Heights
Project Value: £270,000
Client: Taylor Wimpey
Requirements: All Aspects of Housing
Location: Rhoose Point
Sector: Residential

 IWC completed this project in 2016.  Works involved the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.

 

Channel Heights is a mix of  87, 3, 4 and 5 bedroom homes located in the popular location of Rhoose in the Vale of Glamorgan.

Greenfields Court

Project: Greenfields Court
Project Value: £260,000
Client: Persimmon Homes
Requirements: All Aspects of Housing
Location: Newport
Sector: Residential

IWC completed this project in 2016.

 

Work involved the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.  IWC also supplied plasterboard for top tack, UPVC.  All work was managed by our onsite operatives.

Allt Yr Yn

Project: Allt Yr Yn
Project Value: £420,000
Client: Taylor Wimpey
Requirements: All Aspects of Housing
Location: Newport
Sector: Residential

IWC are currently working on this project.  

 

Work involves the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.

 

Allt Yr Yn is a mix of 3, 4 and 5 bedroom homes in Newport.

Maes-Y-Ffion

Project: Maes-Y-Ffion
Project Value: £140,000
Client: Bellway Homes
Requirements: All Aspects of Housing
Location: Aberdare
Sector: Residential

IWC completed this project in December 2015.

 

Work involved the installation of trusses, joists, 1st fix, 2nd fix and finals to all houses at the above project.  IWC also supplied all CLS for studwork and plasterboard for top tack.  All work was managed by our IWC team of operatives.

Hardwicke

Project: Hardwicke
Project Value: £750,000
Client: Redrow
Requirements: All Aspects of Housing
Location: Gloucester
Sector: Residential

IWC completed this project in 2016.  

 

Work involved the installation of trusses, joists, 1st fix, 2nd fix finals and cladding to all houses at the above project.

 

Sellars Bridge is a mix of 2, 3, 4 and 5 bedroom houses.